Gap in NCR2 next to Prince of Wales Roundabout
Cyclists need to walk for a short distance to follow NCR2 next to the Prince of Wales Roundabout if they wish to avoid using the A20 on the roundabout.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first, limited to the area of Spokes East Kent:
Created by Gregory Williams // 1 thread
Cyclists need to walk for a short distance to follow NCR2 next to the Prince of Wales Roundabout if they wish to avoid using the A20 on the roundabout.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Gregory Williams // 1 thread
A new Sainsburys supermarket is proposed at Westgate-on-Sea. The cycle infrastructure in this location is poor and this is an opportunity to help improve it.
Created by Gregory Williams // 0 threads
The cycle parking standards for Medway can be found here:
http://www.medway.gov.uk/pdf/Medway%20Council%20Residential%20Parking%20Standards%20Jan%202010.pdf
The standards have low minimum quantities and are very basic in their detail. There is no mention, for example, of the minimum space needed to be left around cycle parking, or the spacing of the cycle parking for it to be effective. Nor is there any mention of what constitutes an acceptable type of cycle parking (e.g. Sheffield stands) and what is unacceptable (e.g. wheelbenders). No mention is made about provision of covered cycle parking. No mention is made of the proximity of cycle parking to building entrances. No mention is made of the need for cycle parking to be highly visible and for lighting and CCTV coverage.
Created by Gregory Williams // 1 thread
Proposed 20mph speed limit along School Road, Saltwood. The design involves removing the buildout at the Brockhill Road junction and installing overrunnable humped buildouts at regular intervals on alternate sides of School Road. "Gate" features with kerb buildouts to restrict the road width will denote the start and end of the 20mph zone.
Created by Gregory Williams // 1 thread
This portion of the cycle path near Reed Pond gets quite muddy on an annual basis. In the autumn / winter / spring it can sometimes be quite difficult to traverse.
Created by Gregory Williams // 1 thread
The gaps between the boards on the ramp connecting to the Weir Court cycle bridge mean that cyclists crossing the bridge could get their wheels caught in the gaps.
Created by Gregory Williams // 0 threads
A new playground is being proposed in the vicinity of Vauxhall Avenue. The playground is welcome, but it is important that its placement does not jeopardise the long-term ambition of a riverside cycle route.
Created by Gregory Williams // 1 thread
The cycle parking at the new Waitrose in Ashford is positioned such that some spaces are not available for use. One rack is too close to a bollard. Both racks are too close to each other.
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Gregory Williams // 1 thread
Canterbury planning permission CA//09/00142 includes an emergency access road, which is intended to be open to cyclists. This provides a vital link in the riverside cycle route in Canterbury. The rest of the construction on this planning application has been completed, but, contrary to conditions 12 and 13 of the appeal planning permission the emergency access link and the final portion of the cycle path have not been constructed.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Gregory Williams // 0 threads
Substantial development: 55 dwellings, 63000sqm business use, 2000sqm local centre.
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.
Created by Gregory Williams // 1 thread
12-month trial traffic restriction at Westgate Towers with a view to pedestrianisation of the road through the towers. Access in the area will be largely limited to buses, taxis, and cyclists.
Created by Gregory Williams // 1 thread
Proposals are being made to provide a surfaced route suitable to facilitate a direct and largely traffic free route for cycling between Whitfield and Dover town.
Created by Gregory Williams // 1 thread
Student accommodation and cycle parking.
Created by Gregory Williams // 1 thread
Redevelopment of the Sittingbourne Mill site to include a superstore, approximately 150 new houses, and a park.
Created by Gregory Williams // 1 thread
Proposed new cycle path beside Westwood Road. This closes a gap in the cycle path network in Thanet.
Created by Gregory Williams // 1 thread
Speed limit reduction from National Speed Limit to 30mph on this narrow section of road which forms part of National Cycle Route 1.
Created by Gregory Williams // 1 thread
Phase 2 of the River Dour Greenway will connect the existing portion of the River Dour Greenway cycle route with National Cycle Routes 1 and 2 on Dover's seafront. It'll also connect to Regional Cycle Route 17.
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Gregory Williams // 1 thread
This proposed cycle path will remove the need to climb a hill when following the Great Stour Way to reach Canterbury city centre. It'll also increase the proportion of traffic-free path used for the route and remove some areas of potential conflict with other road users due to parked cars.
Created by Gregory Williams // 1 thread
Completion of this section of the riverside cycle path will allow students to cycle virtually traffic free from the Parham Road Student Village into Canterbury city centre. Making this route cycleable will allow the existing and proposed developments at the Parham Road Student Village to fulfil their car-free objectives.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Gregory Williams // 2 threads
Accommodation for 432 students is proposed on land at the rear of the Peugeot Motor Company in Canterbury. This provides an ideal opportunity to link Canterbury Christchurch University's Augustine House Library into Canterbury's cycle network.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Created by Gregory Williams // 1 thread
Canterbury planning permission CA//09/00142 includes an emergency access road, which is intended to be open to cyclists. This provides a vital link in the riverside cycle route in Canterbury. The rest of the construction on this planning application has been completed, but, contrary to conditions 12 and 13 of the appeal planning permission the emergency access link and the final portion of the cycle path have not been constructed.
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Gregory Williams // 1 thread
Planning application Y12/0897/SH proposes the redevelopment of a significant portion Folkestone Harbour and surrounding land. The proposals include up to 1000 dwellings and up to 10000sqm of commercial landuse. NCR2 runs through the development area.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
Created by Gregory Williams // 1 thread
The Oyster Bay Trail phase 2 will close a gap in the cycle network between the existing Oyster Bay Trail at Swalecliffe, Herne Bay and Reculver, the Viking Coastal Trail around Thanet, and the Crab & Winkle Way between Whitstable and Canterbury.
Created by Gregory Williams // 1 thread
The cycle parking at Canterbury's Asda is conveniently located for the shop entrance, but doesn't properly secure or support bicycles. Hence parts of bicycles go missing and cyclists choose to secure to other street furniture.
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.